03:06 07 Dec 24
Info Report Check
Submission incomplete:
Scope: The verification and certification report does not state that the monitoring has been carried out in accordance with registered or the revised monitoring plan as per VVS version 09.0 paragraph 392.
Issue: The verification report on page 15 mentions that the main and check energy meters for measuring the electricity exported and imported from the gird were installed on 03/12/2014. It is noted from the monitoring report that during the period from 07/05/2013 until 03/12/2014 the amount of electricity exported and imported is reported and used for calculating the emissions reduction. However there is no information provided in the monitoring report or verification report on how this measurement was conducted for the period when the main and check energy meters were not installed.
Scope: The verification and certification report does not state that the monitoring has been carried out in accordance with registered or the revised monitoring plan as per VVS version 09.0 paragraph 392.
Issue: The verification report on page 15 mentions that the main and check energy meters for measuring the electricity exported and imported from the gird were installed on 03/12/2014. It is noted from the monitoring report that during the period from 07/05/2013 until 03/12/2014 the amount of electricity exported and imported is reported and used for calculating the emissions reduction. However there is no information provided in the monitoring report or verification report on how this measurement was conducted for the period when the main and check energy meters were not installed.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: