Scope: The verification report does not determine if the assumptions used in emission calculations have been justified and/or emission factors, default values and other reference values have been correctly applied. (VVM v.1.2 para 208 (d) & (e))
Issue: The DOE shall: i) further clarify how the baseline emission factor, EFbl, (0.0822 tN2O/tHNO3) has been recalculated as mentioned in the verification report whereas the (re)calculation of this parameter was not shown in the submitted spreadsheet. In addition the version 6 of this spreadsheet as referred by both final monitoring report and verification report have not been submitted and ii) confirm the conservativeness of the calculated emission reductions as it appears that the nitric acid production for the current project campaign (55,116 tHNO3) has exceeded the plant design capacity (54, 553 tHNO3) for an equivalent number of 205 days.