19:14 18 Nov 24
Info Report Check
Submission incomplete:
Scope: The verification and certification report does not provide a summary of the verification process, the scope of verification and the conclusion as per VVS version 09.0 paragraph 409 (a).
Issue: In line with the Implementation plan for new CDM regulations, If a request for registration or issuance following the old regulatory framework was submitted by 28 March 2018 and is resubmitted on or after 29 March 2018 after the completeness check or the information and reporting check by the secretariat, the request may still follow the old regulatory framework, provided that the resubmission is made within 90 days. This request for issuance was submitted on 23/07/2018 which is later than 29/03/2018 and it is not within the 90 days from the previous submission dated 16/10/2017.
Scope: The verification and certification report does not provide a summary of the verification process, the scope of verification and the conclusion as per VVS version 09.0 paragraph 409 (a).
Issue: In line with the Implementation plan for new CDM regulations, If a request for registration or issuance following the old regulatory framework was submitted by 28 March 2018 and is resubmitted on or after 29 March 2018 after the completeness check or the information and reporting check by the secretariat, the request may still follow the old regulatory framework, provided that the resubmission is made within 90 days. This request for issuance was submitted on 23/07/2018 which is later than 29/03/2018 and it is not within the 90 days from the previous submission dated 16/10/2017.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: