Info Report Check
Submission incomplete:
1: Scope: The monitoring report does not contain the values of the monitored parameters. (EB 54 Annex 34)
Issue:The methodology indicates that the baseline campaign is the most recent campaign preceding the start of the project activity. However, it is noted that for N1 plant, baseline campaign was selected from 01/11/2006 to 19/04/2007 whereas there were one additional campaign between baseline and project campaigns without N2O abatement catalyst, and for N2 plant, baseline campaign was selected from 16/11/2006 to 27/01/2007 whereas there were two additional campaigns between baseline and project campaigns without N2O abatement catalyst. Information is required on the operating and N2O emissions data and emission factors of the immediate campaigns prior to the project campaigns.

2: Scope: The verification report does not list each parameter required by the monitoring plan (VVM v.1.2 para 206)
Issue:The methodology indicates that the baseline campaign is the most recent campaign preceding the start of the project activity. However, it is noted that for N1 plant, baseline campaign was selected from 01/11/2006 to 19/04/2007 whereas there were one additional campaign between baseline and project campaigns without N2O abatement catalyst, and for N2 plant, baseline campaign was selected from 16/11/2006 to 27/01/2007 whereas there were two additional campaigns between baseline and project campaigns without N2O abatement catalyst. Information is required on the operating and N2O emissions data and emission factors of the immediate campaigns prior to the project campaigns.