Info Report Check
Submission incomplete:
1: 1) Number of new locations: According to the PRC-VR, pages 7 and 8, there are seven new locations for WTGs, namely BGN022, MLN036, MLN060, MLN061, MLN067, MLN085 and MLN101. Same number of new locations (seven) is counted on pages 3 and 4; and 7, 10 and 11 in the PDD track changes version. The DOE is requested to clarify the statement that “there are changes in the WTG location number for six WTGs…”. I doing so, please revise all the documentation, so that the number is consistent across all the PRC and issuance documents (PRC VR, PDD clean and track changes, MR, VCR).


2: 2) Updated locations of the WTGs:

a. The geo coordinates of the new locations of the WTGs in the renewed PDD track changes (pages 7, 10 and 11) do not match with the geo coordinates on the map on page 11 of the monitoring report. The DOE is requested to provide a new map with updated longitudes and latitudes of the new locations of the WTGs.

b. Additionally, the DOE is requested to confirm and provide a statement that there has not been a substantive change due to the new locations of the WTGs being outside the project boundary.



3: 3) Crediting period: There is an inconsistency across the PRC and issuance documents with regards to the renewable crediting period, namely:
a. Renewed PDD clean version, page 39: 7 years starting from 25/07/2016;
b. MR, page 12: 7 years vs. 25/07/2016 to 24/07/2022 (6 years);
c. VCR, page 1: 25/07/2016 -24/07/2023 (7 years) vs. page 14: 25/07/2016 -24/07/2022 (6 years).
The DOE is requested revise all the documentation, so that the dates of the crediting period is consistent across all the PRC and issuance documents (PRC VR, PDD clean and track changes, MR, VCR).