Info Report Check
Submission incomplete:
1: Scope: The verification report does not provide a conclusion on the verified amount of emission reductions achieved and/or determine that calculations of baseline emissions, project emissions and leakage as appropriate have been carried out in accordance with the formulae and methods described in the monitoring plan and the applied methodology document. (VVM v.1.2 para 208 (c) & 221 (h))
Issue: The DOE is required to provide further information on why the monitored value (0.0405 TJ/t) of NCV of fuel oil was not used for the calculation of the project emission.

2: Scope: The certification report does not indicate the monitoring period under verification and/or the corresponding number of CERs requested by the DOE. (EB48 Annex 68 para 10 (d))
Issue: The monitoring report indicates that the project emission is 3,275,860.3 tCO2 and the baseline emission is 3,316,940.8 tCO2 while the certification report states that the baseline emission is "41,080 t CO2" and the project emission is "0 t CO2". The DOE is required to provide further clarification on the different values between the montioring report and the certification report.