05:50 15 Jan 25
Info Report Check
Submission incomplete:
1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue: The PP/DOE are requested to: i) report on the minimum frequency for the cleaning or replacement of the FTIR windows, and ii) recalibration of the FTIR devices considering that the Monitoring Report (section B.1) reports that the SF6 abatement system was shutdown from 1/01/2011 to 19/01/2011 due to the maintenance of the pre-treatment system. In doing so please refer to the AM0078 methodology, page 12.
2: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan? (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue: The DOE is requested to: i) clarify the inconsistency in the FTIR device calibration as the verification report (page 19) indicates that the last calibrations on FTIRs were done on 08 November 2010 while the Monitoring Report (pages 28/29) show that the calibrations were done on 08 November 2010 and 07 December 2010, ii) provide information on the calibration frequency of the electricity meters and LNG flowmeters.
1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue: The PP/DOE are requested to: i) report on the minimum frequency for the cleaning or replacement of the FTIR windows, and ii) recalibration of the FTIR devices considering that the Monitoring Report (section B.1) reports that the SF6 abatement system was shutdown from 1/01/2011 to 19/01/2011 due to the maintenance of the pre-treatment system. In doing so please refer to the AM0078 methodology, page 12.
2: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan? (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue: The DOE is requested to: i) clarify the inconsistency in the FTIR device calibration as the verification report (page 19) indicates that the last calibrations on FTIRs were done on 08 November 2010 while the Monitoring Report (pages 28/29) show that the calibrations were done on 08 November 2010 and 07 December 2010, ii) provide information on the calibration frequency of the electricity meters and LNG flowmeters.