Submission incomplete:
Scope:
The verification report does not list each parameter required by the monitoring plan and does not provide an statement on how the DOE verified the information flow (from data generation, aggregation, to recording, calculation and reporting) for these parameters including the values in the monitoring reports (VVS v2, para 236, 284 (e)).
Issue:
The DOE is requested to explain how it validated the correctness of the ER calculation. In doing so, the DOE is requested to explain how it verified the values reported for electricity imported measured by M2 and by M3, given that EG imported measured by M3 is higher than EG measured by the general meter M2.