1: In the revised PDD, (a) under section B.7.1, a description of parameters VB,dry-gas,y (“not including dry gas used as fuel at oil flow station as substitute for wet gas, estimated to 7 MMSCFD”) has been removed; (b) the value of parameter d and L are corrected; and (c) under section B.6.2 and section B.7.1 of the PDD, monitoring frequency and purpose of data are added. In validating those changes, the DOE has simply confirmed compliance with paragraph 307-311 of VVS version 7, without any specific explanation. The DOE shall provide information on how it has validated those changes will not compromise accuracy and conservativeness. Please refer to VVS version 7, paragraph 308 and 311.
2: The PP/DOE is requested to provide information on how the addition of capturing associated gas from an additional oil field out of the original project boundary has been considered as a change to project design that does not need prior approval from the Board. In particular, the DOE is requested to provide information on how it has validated that the proposed change would not adversely affect baseline and additionality of the project activity, considering: (a) the identified baseline scenario might not be appropriate as a result of the proposed or actual modifications to the project activity with the different time scale for the two oil fields and with the modification in the physical boundary for the project activity; and (b) revised/updated investment analysis due to the added oil field has not been provided. In doing so, the DOE shall also provide information related to suitability of parameters for the revised/updated investment analysis due to addition of new oil field. Please refer to project standard (PS) version 7, paragraph 280 and validation and certification standard (VVS), version 7 paragraph 318 & 319.
1: In the revised PDD, (a) under section B.7.1, a description of parameters VB,dry-gas,y (“not including dry gas used as fuel at oil flow station as substitute for wet gas, estimated to 7 MMSCFD”) has been removed; (b) the value of parameter d and L are corrected; and (c) under section B.6.2 and section B.7.1 of the PDD, monitoring frequency and purpose of data are added. In validating those changes, the DOE has simply confirmed compliance with paragraph 307-311 of VVS version 7, without any specific explanation. The DOE shall provide information on how it has validated those changes will not compromise accuracy and conservativeness. Please refer to VVS version 7, paragraph 308 and 311.
2: The PP/DOE is requested to provide information on how the addition of capturing associated gas from an additional oil field out of the original project boundary has been considered as a change to project design that does not need prior approval from the Board. In particular, the DOE is requested to provide information on how it has validated that the proposed change would not adversely affect baseline and additionality of the project activity, considering: (a) the identified baseline scenario might not be appropriate as a result of the proposed or actual modifications to the project activity with the different time scale for the two oil fields and with the modification in the physical boundary for the project activity; and (b) revised/updated investment analysis due to the added oil field has not been provided. In doing so, the DOE shall also provide information related to suitability of parameters for the revised/updated investment analysis due to addition of new oil field. Please refer to project standard (PS) version 7, paragraph 280 and validation and certification standard (VVS), version 7 paragraph 318 & 319.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: