Info Report Check
Submission incomplete:
1: The Monitoring Report does not include a line diagram showing the main monitoring points, as required by para. 259 of the PS-PA, v.03.0.


2: As per the PDD, equations 24 and 23, the following formulas are required to calculate (a) PEBR=GPWCH4*EFCH4,BR*SUM(BRPJ,n,y*NCVn,y) and;
(b) PETR=SUM (Df,m * FRf,m * EFCO2 * 10^-6).
However, as per the submitted spreadsheet TAG šER Calculationš, it is found that:
(1) The PEBR has been calculated considering the average of the measured NCV values (CELL F251) times the total quantity of biomass used during the monitoring period (CELL F250) and
(2) The PETR has been calculated considering the average of the measured return trip distances (CELL F313) times the total mass (CELL F314) transported in the monitoring period.

The PP/DOE is requested to clarify the issues and to submit a revised documents, including the updated calculation spreadsheet in line with the requirements of para. 265 of the PS-PA, v.03.0 and para. 373 (c )of the VVS-PA v.03.0.