16:48 30 Dec 24
Info Report Check
Submission incomplete:
Scope: The validation opinion does not contain information on how the DOE validated that the changes from the registered monitoring plan are in accordance to para 4 and 5 of the Appendix 1 of Project Standard which do not require prior approval of the Board (VVS v2, para 248,262)
Issue: the post registration change (PRC) to the PDD (i.e. inclusion of the parameter "NCVcoal,y" in the monitoring plan) is to be regarded as a permanent change from the registered monitoring plan (as also mentioned in section 3.2 of the verification report). The DOE validation opinion on the PRC does not contain information on how the DOE concluded that the change is in accordance to para 4 and 5 of the Appendix 1 of the Project standard and do not require prior approval by the Board.
Scope: The validation opinion does not contain information on how the DOE validated that the changes from the registered monitoring plan are in accordance to para 4 and 5 of the Appendix 1 of Project Standard which do not require prior approval of the Board (VVS v2, para 248,262)
Issue: the post registration change (PRC) to the PDD (i.e. inclusion of the parameter "NCVcoal,y" in the monitoring plan) is to be regarded as a permanent change from the registered monitoring plan (as also mentioned in section 3.2 of the verification report). The DOE validation opinion on the PRC does not contain information on how the DOE concluded that the change is in accordance to para 4 and 5 of the Appendix 1 of the Project standard and do not require prior approval by the Board.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: