Submission incomplete:
1: Scope: The monitoring report does not contain the values of the monitored parameters. (EB 54 Annex 34)
Issue:
As per the Verification Report (p 7), from 21 October 2010 to 20 November 2010, the values used for the monitoring of EGs,y was done by the meter M2. However the monitoring report (p11) indicates that the values used come from the reading of the meter M1. The project participant is requested to clarify this inconsistency.
2: Scope: The spreadsheet does not contain all parameters required to be monitored and/or reported at the intervals required by the monitoring plan and the applied methodology?
Issue:
As per the Verification Report (p 7), from 21 October 2010 to 20 November 2010, the values used for the monitoring of EGs,y was done by the meter M2. However the excel sheet provided indicates that the values used come from the reading of the meter M1. The project participant is requested to clarify this inconsistency.
1: Scope: The monitoring report does not contain the values of the monitored parameters. (EB 54 Annex 34)
Issue:
As per the Verification Report (p 7), from 21 October 2010 to 20 November 2010, the values used for the monitoring of EGs,y was done by the meter M2. However the monitoring report (p11) indicates that the values used come from the reading of the meter M1. The project participant is requested to clarify this inconsistency.
2: Scope: The spreadsheet does not contain all parameters required to be monitored and/or reported at the intervals required by the monitoring plan and the applied methodology?
Issue:
As per the Verification Report (p 7), from 21 October 2010 to 20 November 2010, the values used for the monitoring of EGs,y was done by the meter M2. However the excel sheet provided indicates that the values used come from the reading of the meter M1. The project participant is requested to clarify this inconsistency.