Info Report Check
Submission incomplete:
Scope: The spreadsheet does not contain all parameters required to be monitored and/or reported at the intervals required by the monitoring plan and the applied methodology?
Issue: The monitoring plan (the registered PDD, page 32) requires the monitoring of "TEGy" (measured continuously and recorded on a monthly basis) – "Total electricity produced by the project activity in year y" as a separate parameter. However, the monitored data for this parameter has not been reported in the spreadsheet. Kindly provide the required information.