Submission incomplete:
VVS-PA, para 354:
As per section B.1 of the monitoring report, it is mentioned that the project activity is a part of 20.35MW solar power project. However, the same was not indicated at the time of project registration. Further, as per section E.6.2, of the verification report, from November 2019, the state utility issued JMRs in parts as - 1 MW, 2 MW and 3.65 MW respectively adding up to 6.65 MW. The DOE is therefore requested to clarify how it has confirmed that the implementation of the project activity has been conducted in accordance with the description contained in the registered PDD. In doing so, the DOE shall also: (a) Provide information on the 20.35 MW project that is described in the monitoring report; (b) Confirm If this project activity 10017 is a single project or a bundled project activity in light of the JMR being issued in parts; (c) Explain why a PRC is not requested to address the non-compliance with regard to the project activity being part of 20.35 MW solar power project as per VVS-PA, para 354.