Info Report Check
Submission incomplete:

The DOE is requested to clarify:
a) whether there is any change in the project design along with the change of the LFG collection efficiency. If yes, the DOE is requested to explain why this is considered as correction rather than changes to the project design;
b) whether the proposed change in the LFG collection efficiency has an impact on the electricity generation that was estimated prior to the PRC and therefore the additionality and;
c) how the proposed change in the LFG collection efficiency is in line with the methodology ACM0001 version 19 (table 6, page 27), as it requires a project to apply either default 50% value or an efficiency based on the “technical specifications of the LFG capture system to be installed”, whereas the revised value proposed by the PP is based on the historical/actual data (page 10 and 19 of the validation report) provided by Biotecnogas, the LFG implementer.
Paragraphs 288(b) and 300 of VVS-PA.