1: Paragraph 354(a) of VVS-PA:
The monitoring report states that the turbines are designed to generate higher output from optimum generation during the monsoon season. The DOE is requested to explain how it verified the PP's statement that the turbines of the project are indeed design to generate higher output from optimum generation during the monsoon season. In doing so, in the absence of onsite inspection and in light of the project activity has been consistently generating more electricity than estimated, the DOE is also requested to explain what other documents it verified, in addition to photographic evidence and name plate, to ensure that the actual capacity of the project is as per the PDD.

2: Paragraph 365 of VVS-PA:
The DOE concluded that annual calibration frequency complies with the registered monitoring plan and is as per industry practice. The DOE is requested to explain how it verified the conduct of the calibration as there are delayed calibration observed for main meter with S.No. 11100320 and check meter with S.No. 11100321. The meters were calibrated on 05/11/2014 and the subsequent calibration only took place on 09/11/2015 which is more than one year.