Info Report Check
Submission incomplete:
1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue:
The PP is required to provide further information about the calibration of the meters (e.g. date of calibration and validity) as the monitoring report does not include this information.
2: Scope: The verification report does not provide an assessment that all physical features of the proposed CDM project activity proposed in the registered PDD are in place and/or that the project participant has implemented and operated the proposed CDM project activity as per the registered PDD or the approved revised PDD. (VVM v.1.2 para 196)
Issue: The PDD (p3) states that "The “Visakhapatnam (India) OSRAM CFL distribution CDM Project” involves the distribution of approx. 450.000 to 500,000 OSRAM Long life Compact Fluorescent Lamps (CFLs)" while the monitoring report (p 6) indicates that the total number of CFL distributed is 669,036. Further clarification is required how the DOE verified the project implementation as per the PDD.
1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue:
The PP is required to provide further information about the calibration of the meters (e.g. date of calibration and validity) as the monitoring report does not include this information.
2: Scope: The verification report does not provide an assessment that all physical features of the proposed CDM project activity proposed in the registered PDD are in place and/or that the project participant has implemented and operated the proposed CDM project activity as per the registered PDD or the approved revised PDD. (VVM v.1.2 para 196)
Issue: The PDD (p3) states that "The “Visakhapatnam (India) OSRAM CFL distribution CDM Project” involves the distribution of approx. 450.000 to 500,000 OSRAM Long life Compact Fluorescent Lamps (CFLs)" while the monitoring report (p 6) indicates that the total number of CFL distributed is 669,036. Further clarification is required how the DOE verified the project implementation as per the PDD.