06:59 27 Dec 24
Info Report Check
Submission incomplete:
Scope: The verification report does not provide an assessment of the compliance with EB 52 Annex 60 'Guidelines for assessing compliance with the calibration frequency requirements' for the calibration delay. (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue: Further clarification is required on how the DOE applied para 4 of annex 60 of EB 52 to the delayed calibration of “the flow meters” as the revised monitoring plan requires the monitoring of annual quantity of NG consumed from NG flow meter reading at the project boundary, the verification report (p14) and monitoring report (p 10) stated “the flow meters not exceed 1% of full-scale rating” and the DOE accepted the use of 0.34% for the calculation of the project emissions.
Scope: The verification report does not provide an assessment of the compliance with EB 52 Annex 60 'Guidelines for assessing compliance with the calibration frequency requirements' for the calibration delay. (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue: Further clarification is required on how the DOE applied para 4 of annex 60 of EB 52 to the delayed calibration of “the flow meters” as the revised monitoring plan requires the monitoring of annual quantity of NG consumed from NG flow meter reading at the project boundary, the verification report (p14) and monitoring report (p 10) stated “the flow meters not exceed 1% of full-scale rating” and the DOE accepted the use of 0.34% for the calculation of the project emissions.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: