Info Report Check
Submission incomplete:
1: The registered PDD (page 23) assumes two default values to be applied for the parameter “CO2 emission factor for freight transportation activity (i.e. Light vehicles (245 gCO2/t km) and heavy vehicles (129 gCO2/t km))”. The leakage calculation has applied only one value (129 gCO2/t km) for the heavy vehicles. The DOE shall provide information on how it verified that only heavy vehicles delivered the biomass consumed in the project activity for the entire 4 years covered by the current monitoring period.


2: The DOE shall address the following inconsistencies in the emission reduction excel sheet (energy balance workbook):
i. The energy balance (Cell M18) indicates a calculated annual energy content of 1,506 TJ for the consumed biomass whereas the verification report (page 17) verifies an energy content of 1,633.08 TJ; and
ii. The project activity boiler efficiency is indicated as 80% (PDD, page 6 and the verification report page 2) and 64.55% (energy balance workbook, Cell C2).