07:47 16 May 25
Info Report Check
Submission incomplete:
Scope: The revised PDD does not contain a description of the nature and extent of the proposed or actual changes to the project design of a registered project activity (PS v1, para 218 (a)(b)(c)(d)(e)
1)It is not clear how the DOE has validated that the change of PLF is a permanent change considering that the PLF varies from 45.3% to 59.7% from 2007 to 2010 and the highest actual data is applied for the change. Please clarify.
2)The DOE is requested to clarify how it has determined the operation period is 365 days and how it has taken into account the scheduled maintenance and shutdown.
3)The DOE is requested to clarify how it has closed CAR 10 and how it has verified the calculation of Svent and its impact on the PLF, resulting a change from 85%(previous PRC submission) to 59.7%. The DOE is further requested to substaniate how the Svent calculation is conservative under the context of additionality and baseline scenario determination in the request of post-registration change.
Scope: The revised PDD does not contain a description of the nature and extent of the proposed or actual changes to the project design of a registered project activity (PS v1, para 218 (a)(b)(c)(d)(e)
1)It is not clear how the DOE has validated that the change of PLF is a permanent change considering that the PLF varies from 45.3% to 59.7% from 2007 to 2010 and the highest actual data is applied for the change. Please clarify.
2)The DOE is requested to clarify how it has determined the operation period is 365 days and how it has taken into account the scheduled maintenance and shutdown.
3)The DOE is requested to clarify how it has closed CAR 10 and how it has verified the calculation of Svent and its impact on the PLF, resulting a change from 85%(previous PRC submission) to 59.7%. The DOE is further requested to substaniate how the Svent calculation is conservative under the context of additionality and baseline scenario determination in the request of post-registration change.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: