Info Report Check
Submission incomplete:
Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVS v2 para 235)
Issue: The diagram in page 7 of the monitoring report shows two monitoring points for %CH4 (one going to biogas engines and one going to flare). The DOE is requested to clarify: (i) what parameters measured by each monitoring point; (ii) the monitoring point of parameters FCH4 and fvCH4,RG,h; (iii) whether the monitoring point for parameter fvCH4,RG,h is the same as FCH4, considering as per the monitoring report both parameters are monitored by gas analyzer with serial number 31827.