Info Report Check
Submission incomplete:
Scope: The verification report does not state how the DOE verified the information flow for the listed parameters. (VVM v.1.2 para 206)
Issue: The monitoring plan requires that the "Area of the reservoir measured in the surface of water, after the implementation of the project activity, when the reservoir is full" is to be measured annually. However the monitoring report and the verification report do not provide any information on when the measurement was done. Further it is not clear how the DOE verified the reservoir surface area as the letter referred by the DOE was not included in the references.