Info Report Check
Submission incomplete:
1: Scope: The monitoring report does not contain the values of the monitored parameters. (EB 54 Annex 34)
Issue:
The exact gauze compositions for the historical campaigns (GCnormal), the Baseline Campaign (GCBL) and for the Project Campaign (GCProject) were not provided in the monitoring report. The project participant is requested to report these data.
2: Scope: The monitoring report does not contain calculations of baseline emissions, project emissions, leakage (if any), and/or emission reductions, including reference to formulae and methods used. (EB48 - Annex 68 paragraph 10 (a) (vii))
Issue:
The monitoring report states (p 35) that the design capacity of the plant is 450 t/day whereas the approved revised monitoring plan states (p 13) that the cap that should be used for calculation is 425 t/day. The project participant is requested to clarify this inconsistency.
3: Scope: The spreadsheet does not contain all parameters required to be monitored and/or reported at the intervals required by the monitoring plan and the applied methodology?
Issue:
The excel sheet does not contain the raw data of the values used during historical campaigns to establish the range of operating conditions. The project participant is requested to provide these data.
1: Scope: The monitoring report does not contain the values of the monitored parameters. (EB 54 Annex 34)
Issue:
The exact gauze compositions for the historical campaigns (GCnormal), the Baseline Campaign (GCBL) and for the Project Campaign (GCProject) were not provided in the monitoring report. The project participant is requested to report these data.
2: Scope: The monitoring report does not contain calculations of baseline emissions, project emissions, leakage (if any), and/or emission reductions, including reference to formulae and methods used. (EB48 - Annex 68 paragraph 10 (a) (vii))
Issue:
The monitoring report states (p 35) that the design capacity of the plant is 450 t/day whereas the approved revised monitoring plan states (p 13) that the cap that should be used for calculation is 425 t/day. The project participant is requested to clarify this inconsistency.
3: Scope: The spreadsheet does not contain all parameters required to be monitored and/or reported at the intervals required by the monitoring plan and the applied methodology?
Issue:
The excel sheet does not contain the raw data of the values used during historical campaigns to establish the range of operating conditions. The project participant is requested to provide these data.