1: The monitoring report did not indicate the formulae used for, and provide the calculations of, the baseline emissions, project emissions and leakage. Please refer to the Project Standard for Project Activities version 1.0, paragraph 265.
The applied version of the methodological tool "Tool to determine the mass flow of a greenhouse gas in a gaseous stream" states, on page 5, that it is necessary to demonstrate that the gaseous stream is dry to use the measurement option A by either measuring the moisture content to the gaseous stream or by demonstrating that the temperature of the gaseous stream is less than 60ºC (333.15 K) at the flow measurement point. However, there is no explanation in the monitoring report how this requirement was met.

2: The verification report does not contain an assessment on the data and calculations of GHG emission reductions or net anthropogenic GHG removals achieved by from the registered CDM project activity. Please refer to the Validation and Verification Standard for Project Activities version 1.0, paragraph 260.
The applied version of the methodological tool "Tool to determine the mass flow of a greenhouse gas in a gaseous stream" states, on page 5, that it is necessary to demonstrate that the gaseous stream is dry to use the measurement option A by either measuring the moisture content to the gaseous stream or by demonstrating that the temperature of the gaseous stream is less than 60ºC (333.15 K) at the flow measurement point. However, there verification report does not contain an assessment on whether this requirement was met.