Info Report Check
Submission incomplete:
1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue:
The DOE shall provide more information how it confirmed that the readings of the flow meter(FI65) used for measuring biogas sent to the engine between the commissioning and date of factory calibration (i.e. 18/04/2009 to 25/04/2009) are correct.

2: Scope: The monitoring report does not contain a comparison of the actual CERs claimed in the monitoring period with the estimate in the PDD, and/or explanation on any significant increase. (EB48 - Annex 68 paragraph 10 (a) (viii)).
Issue:
The DOE shall provide information whether the increase in the ratio of waste water to fresh fruit bunches that explains the increased amount of emission reductions claimed (Section E.5 and E.6 of the MR) was unexpected and temporary.