Submission incomplete:
1: Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVS v2 para 235)
Issue: The verification report (page 11) has stated that a request for approval of temporary deviation (report no. BVC/China-PRC/8773/2012 rev. 01) from the revised monitoring plan (approved on 24/02/2010) is submitted along with this verification report as part of the request for issuance. However, the request for approval of temporary deviation has not been received.
2: Scope: The verification report does not list each parameter required by the monitoring plan and does not provide an statement on how the DOE verified the information flow (from data generation, aggregation, to recording, calculation and reporting) for these parameters including the values in the monitoring reports (VVS v2, para 236, 284 (e)).
Issue: The verification report (page 10) has stated that "during this monitoring period, there are two 10kV lines for supplying electricity to the grid besides the four 110kV lines" which deviates from the registered and/or revised monitoring plan. The verification report (page 13) also shows that the electricity meters have been installed to measure the electricity supplied to and imported from the grid via these two lines. The DOE is requested to indicate whether the data of electricity supplied to the grid via the additional lines are available. If yes, the DOE is requested to list and validate the amount of electricity supplied by the project to the grid via each additional lines, though it has been confirmed by the DOE that conservative approach is taken.
1: Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVS v2 para 235)
Issue: The verification report (page 11) has stated that a request for approval of temporary deviation (report no. BVC/China-PRC/8773/2012 rev. 01) from the revised monitoring plan (approved on 24/02/2010) is submitted along with this verification report as part of the request for issuance. However, the request for approval of temporary deviation has not been received.
2: Scope: The verification report does not list each parameter required by the monitoring plan and does not provide an statement on how the DOE verified the information flow (from data generation, aggregation, to recording, calculation and reporting) for these parameters including the values in the monitoring reports (VVS v2, para 236, 284 (e)).
Issue: The verification report (page 10) has stated that "during this monitoring period, there are two 10kV lines for supplying electricity to the grid besides the four 110kV lines" which deviates from the registered and/or revised monitoring plan. The verification report (page 13) also shows that the electricity meters have been installed to measure the electricity supplied to and imported from the grid via these two lines. The DOE is requested to indicate whether the data of electricity supplied to the grid via the additional lines are available. If yes, the DOE is requested to list and validate the amount of electricity supplied by the project to the grid via each additional lines, though it has been confirmed by the DOE that conservative approach is taken.