Info Report Check
Submission incomplete:
As per VVS para 377 (c), the DOE shall determine whether the baseline emissions calculations have been carried out in accordance with the formulae and methods described in the registered monitoring plan;
As per the PDD, EGBL is calculated as EGexport – EGimport, and EGexport is calculated as EGgross – EGaux. Therefore, EGBL equals EGgross – EGaux – EGimport. However, from the ER spreadsheet it is observed that the values of EGBL are not calculated values and the values do not equal EGgross – EGaux – EGimport. The DOE is requested to clarify: (a) how it verified the baseline emission calculations as per the formula in the PDD; (b) the discrepancy between the values of EGexport that are measured and the values of EGgross – EGaux.