1: Scope: The monitoring report does not contain a description of the nature, extend and duration of the non-conforming monitoring and the proposed alternative monitoring of the project activity (PS v1 para 206)
Issue: The monitoring report does not contain a description of the duration of the dismantle of the main meter (II) to which a temporary deviation from the monitoring plan has been requested. The project participant is requested to provide the missing information.

2: Scope: The verification report does not list each parameter required by the monitoring plan and does not provide an statement on how the DOE verified the information flow (from data generation, aggregation, to recording, calculation and reporting) for these parameters including the values in the monitoring reports (VVS v2, para 236, 284 (e)).
Issue: The Verification Report does not state how the DOE verified that the electricity imported from the grid to the dam site has been correctly monitored, considering that the main meter (II) has been dismantled and that there is no increase of the imported electricity on the monitoring record of the Main Meter (I). Additionally, the monitoring report states that the electricity imported of the dam site was monitored by main meter (I) after this dismantling; however the revised electricity diagram pertaining to page 5 of the monitoring report has not illustrated how the main meter (I) monitors the electricity imported from the grid to the dam site. The DOE is requested to provide clarification concerning this issue.