Submission incomplete:
Scope: The monitoring report is not consistent in the implementation status of the project during the monitoring period under consideration. (EB48 - Annex 68 paragraph 10 (a) (i) & EB 54 Annex 34).
The DOE/PP is requested to clarify the implementation schedule of the project activity and the implementation status during the relevant monitoring period. In particular, the DOE/PP is requested to explain the inconsistency in the dates of installation of the last 12 turbines of this project activity (I.e. Table 2 (Operation date of Wind turbines) of the monitoring report (monitoring period 01 Apr 10 - 31 Mar 11) indicates that operation dates of last 12 turbines are in 2009 whereas rest of MR and VR indicate that all the turbines were operation on 29/04/2010).
Scope: The monitoring report is not consistent in the implementation status of the project during the monitoring period under consideration. (EB48 - Annex 68 paragraph 10 (a) (i) & EB 54 Annex 34).
The DOE/PP is requested to clarify the implementation schedule of the project activity and the implementation status during the relevant monitoring period. In particular, the DOE/PP is requested to explain the inconsistency in the dates of installation of the last 12 turbines of this project activity (I.e. Table 2 (Operation date of Wind turbines) of the monitoring report (monitoring period 01 Apr 10 - 31 Mar 11) indicates that operation dates of last 12 turbines are in 2009 whereas rest of MR and VR indicate that all the turbines were operation on 29/04/2010).
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: