Info Report Check
Submission incomplete:
1: Scope: The spreadsheet does not contain all parameters required to be monitored and/or reported at the intervals required by the monitoring plan and the applied methodology?
Issue:
The project participant is requested to provide the daily value of the operating hours of each solar cooker of the sample during the monitoring period as per the monitoring plan in the registered PDD.

2: Scope: The verification report does not provide an assessment that all physical features of the proposed CDM project activity proposed in the registered PDD are in place and/or that the project participant has implemented and operated the proposed CDM project activity as per the registered PDD or the approved revised PDD. (VVM v.1.2 para 196)
Issue:
The DOE is requested to indicate the number of households it visited to asses that all the solar cooker of the project are in place. The DOE is also requested to provide with the rationale behind the number of the visited households to ensure that this number is sufficient.