08:13 10 Mar 25
Info Report Check
Submission incomplete:
1: The DOE shall provide a complete validation of the calibration dates of the equipment/instrument used during the monitoring period as per information contained in the MR which presents calibration dates that are not confirmed by the DOE (p.17 in the Verification Report). E.g. NQ1000: 03/09/2019, 01/10/2020; MN1032: 03/09/2019, 29/09/2019, 01/10/2020; MP1006: 06/08/2019, 03/09/2019, 03/10/2020; and others. In doing so please refer to VVS paragraph 365 and 371.
2: The DOE shall note that the Verification Opinion section (p.24 in the Verification Report) mentions "second monitoring period", which is not correct as this is the first monitoring period. Please refer to VVS paragraph 398.
1: The DOE shall provide a complete validation of the calibration dates of the equipment/instrument used during the monitoring period as per information contained in the MR which presents calibration dates that are not confirmed by the DOE (p.17 in the Verification Report). E.g. NQ1000: 03/09/2019, 01/10/2020; MN1032: 03/09/2019, 29/09/2019, 01/10/2020; MP1006: 06/08/2019, 03/09/2019, 03/10/2020; and others. In doing so please refer to VVS paragraph 365 and 371.
2: The DOE shall note that the Verification Opinion section (p.24 in the Verification Report) mentions "second monitoring period", which is not correct as this is the first monitoring period. Please refer to VVS paragraph 398.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: