1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue: The REVMP specifies that for the back-up diesel electricity generators operational time (Hdiesel) and Biomass steam boiler operational time (Hbiomass), meters will be subject to regular maintenance and testing regime to ensure accuracy. However, the Monitoring Report does not provide information on the calibration of the meters.
2: Scope: The verification report does not state how the DOE verified the information flow for the listed parameters. (VVM v.1.2 para 206)
Issue: The verification report does not state how the DOE verified the information flow for the following parameters: i) Hdiesel; and ii) Hbiomass
3: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan? (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue: The Verification Report does not not provide an assessment on whether the maintenance and testing of measuring equipments was conducted as specified in the revised monitoring plan for the back-up diesel electricity generators operational time (Hdiesel) and Biomass steam boiler operational time (Hbiomass).
1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue: The REVMP specifies that for the back-up diesel electricity generators operational time (Hdiesel) and Biomass steam boiler operational time (Hbiomass), meters will be subject to regular maintenance and testing regime to ensure accuracy. However, the Monitoring Report does not provide information on the calibration of the meters.
2: Scope: The verification report does not state how the DOE verified the information flow for the listed parameters. (VVM v.1.2 para 206)
Issue: The verification report does not state how the DOE verified the information flow for the following parameters: i) Hdiesel; and ii) Hbiomass
3: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan? (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue: The Verification Report does not not provide an assessment on whether the maintenance and testing of measuring equipments was conducted as specified in the revised monitoring plan for the back-up diesel electricity generators operational time (Hdiesel) and Biomass steam boiler operational time (Hbiomass).