Submission incomplete:
1: Scope: The monitoring report does not contain the values of the monitored parameters. (EB 54 Annex 34)
Issue: The Monitoring Report does not contain information on the parameter CAPpj - Installed capacity of the hydropower plant after the implementation of the project activity. This parameter should be monitored annually as per page 17 of the methodology ACM0002 v7 but it is not reported.
2: Scope: The verification report does not state that the monitoring plan is in accordance with the applied methodology. (VVM v.1.2 para 200, 203 & 221(d))
Issue: The Verification Report on page 12 (sections 3.3) does not provide information on how the DOE verified that the monitoring plan is in accordance with the applied methodology, in particular with regard to the required parameter CapPJ (as per page 17 of the methodology) . Information should be provided.
1: Scope: The monitoring report does not contain the values of the monitored parameters. (EB 54 Annex 34)
Issue: The Monitoring Report does not contain information on the parameter CAPpj - Installed capacity of the hydropower plant after the implementation of the project activity. This parameter should be monitored annually as per page 17 of the methodology ACM0002 v7 but it is not reported.
2: Scope: The verification report does not state that the monitoring plan is in accordance with the applied methodology. (VVM v.1.2 para 200, 203 & 221(d))
Issue: The Verification Report on page 12 (sections 3.3) does not provide information on how the DOE verified that the monitoring plan is in accordance with the applied methodology, in particular with regard to the required parameter CapPJ (as per page 17 of the methodology) . Information should be provided.