Submission incomplete:
1: The DOE is requested to address this issue as per paragraph 361 of the VVS for PA.
The PDD page 9 two figures demonstrate auxiliary line with a meter applied in each Suba plant and Usaquen plant. Further PDD page 31 state “…the net electricity supplied to the grid will be determined as the measured quantities of the grid electricity delivered to the grid minus the auxiliary electricity consumption, technical losses and electricity imports from the grid to each project power plant…”. However, there is a lack of information in the MR/VR to confirm whether the auxiliary consumptions are existed and how they are monitored.
2: The PP/DOE is requested to address the issues below as per paragraphs 366, 367 and the appendix of the VVS for PA.
The PP in the MR p18 has the provision that the data measured during the non-calibrated period has been adjusted by applying the maximum error permissible. Further the spreadsheet ER CALCULATION-V2 applies permissible error 0.2% to the Suba plant power generation for the period January 2016 to January 2017. However, the issues below are found:
a) The factor 100 is further divided from the maximum permissible error 0.2% as per the formula set amongst the cells D8 to D20, which is not in line with the provision and the example illustrated in the table 1 of the appendix to the VVS for PA.
b) It is not clear why the permissible error 0.2% is applied only to the net electricity generated from the Suba plant whereas the VVS for PA paragraph 367 and its appendix require that this maximum permissible error is to be applied for both electricity exported and electricity imported respectively in a conservative manner.
1: The DOE is requested to address this issue as per paragraph 361 of the VVS for PA.
The PDD page 9 two figures demonstrate auxiliary line with a meter applied in each Suba plant and Usaquen plant. Further PDD page 31 state “…the net electricity supplied to the grid will be determined as the measured quantities of the grid electricity delivered to the grid minus the auxiliary electricity consumption, technical losses and electricity imports from the grid to each project power plant…”. However, there is a lack of information in the MR/VR to confirm whether the auxiliary consumptions are existed and how they are monitored.
2: The PP/DOE is requested to address the issues below as per paragraphs 366, 367 and the appendix of the VVS for PA.
The PP in the MR p18 has the provision that the data measured during the non-calibrated period has been adjusted by applying the maximum error permissible. Further the spreadsheet ER CALCULATION-V2 applies permissible error 0.2% to the Suba plant power generation for the period January 2016 to January 2017. However, the issues below are found:
a) The factor 100 is further divided from the maximum permissible error 0.2% as per the formula set amongst the cells D8 to D20, which is not in line with the provision and the example illustrated in the table 1 of the appendix to the VVS for PA.
b) It is not clear why the permissible error 0.2% is applied only to the net electricity generated from the Suba plant whereas the VVS for PA paragraph 367 and its appendix require that this maximum permissible error is to be applied for both electricity exported and electricity imported respectively in a conservative manner.