Info Report Check
Submission incomplete:
Scope: The verification and certification report does not describe the implementation status of the project as per VVS version 09.0 paragraph 385 (a).
Issue:
It is observed that the installed solar modules (i.e. 402653 numbers of 100Wp, page 13 of the verification report) verified during this monitoring period is different from the installed solar modules during previous two monitoring periods (i.e. 353505 numbers of 100 Wp solar modules and 50079 numbers of 95 Wp solar modules). The DOE is requested to provide information how it has verified that the project design has not been changed.