Info Report Check
Submission incomplete:
1: The DOE is requested to explain how it verified the calibration of weighbridge. The verification report on page 72 states that the calibration validity of weighbridge is yearly. However, the page 27 of the monitoring report shows the validity of calibration being more than one year. For example, calibration date of 02/08/2014 which was valid until 30/08/2015 (more than one year). Furthermore, with this information, the DOE is also requested to explain whether or not there was delayed calibrations for weighbridge.


2: The DOE is requested to explain how it verified the correctness of the calculation of the emission reductions, in particular the calculation of parameter PEy,ww,treated (Emissions from degradable organic carbon in treated wastewater in the year “y”) in line with equation 2 of the methodology AMS-III.H. The spreadsheet shows that it uses parameter [CH4]y,ww,treated (Dissolved methane content in the treated wastewater), instead of using parameter CODy,ww,treated.