Info Report Check
Submission incomplete:
1: Scope: The spreadsheet does not contain all parameters required to be monitored and/or reported at the intervals required by the monitoring plan and the applied methodology?
The PP is requested to provide information on how the amount of fossil fuels (LDO & CBFS) was monitored, given that the spreadsheet of calculation provides the monitored values in tonnes while the monitoring report indicates that monitoring was performed by means of flowmeters.

The PP/DOE are is also requested to explain how the units of the conversion factor (from litres to tonnes of fossil fuel) were set and verified.

2: Scope: The verification report does not determine that calculations of project emissions as appropriate have been carried out in accordance with the formulae and methods described in the monitoring plan and the applied methodology document. (VVM v.1.2 para 208 (c) & 221 (h))
The DOE is requested to explain how it verified the accuracy of calculation of the project emissions.