Info Report Check
Submission incomplete:
Scope: The verification report does not list each parameter required by the monitoring plan and does not provide an statement on how the DOE verified the information flow (from data generation, aggregation, to recording, calculation and reporting) for these parameters including the values in the monitoring reports (VVS v2, para 236, 284 (e)).
Issue: The DOE is requested to provide a clarification on a) the declaration made in the Verification report page 8 for the project Hapugastenne Phase II, for which the imported electricity from January 07- August 08 was validated through invoices. However, the Monitoring Report page 17 - Note 1 states "CEB only started billing the plant for consumption from the grid from July 2008 and the first bill covered the two month period July and August 2008" and Note 2 states that the consumption before July 2008 was not known and b) why the Monitoring Report page 15 does not mention that the electricity import during the months of January 2007 to December 2007 is based on the average value from a single invoice provided by CEB.