Info Report Check
Submission incomplete:
In the verification report, the DOE states that K-505 was broken down on 5 March 2015 and restored on 16 October 2015 and "there was no power generation occurred @ K-505 from 05.03.2015 to 15.10.2015 and thus no Form-B are available. The emission reduction for the period (05.03.2015 to 15.10.2015) is considered zero (checked by the assessment team in ER sheet version 02)".

It is observed in the spreadsheet which has the electricity generation data on monthly basis, from 1st of a month till the 1st of the consecutive month, reports the electricity generation in March 2015 as 30,600 kWh (Export) and for October 2015 as 51,960 kWh (Export).

The DOE is requested to clarify how it has verified the energy generation and export/import for specific days during March 2015 and October 2015 as K-505 was not in operation for most days of the month, in line with VVS V02, Para 395 (e).