04:46 02 Jun 25
Info Report Check
Submission incomplete:
Scope: The verification report does not describe the actual operation of the project activity. ((VVM v.1.2 para 198 (b)).
The DOE is requested to provide information on how it verified that the project activity has only replaced electricity that, in the absence of the project activity, would have been supplied by Jojobera Thermal Power Plant given that, as per the PDD, the steel making facility appears to be connected to both Jojobera captive power plant and the DVC grid.
Scope: The verification report does not describe the actual operation of the project activity. ((VVM v.1.2 para 198 (b)).
The DOE is requested to provide information on how it verified that the project activity has only replaced electricity that, in the absence of the project activity, would have been supplied by Jojobera Thermal Power Plant given that, as per the PDD, the steel making facility appears to be connected to both Jojobera captive power plant and the DVC grid.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: