Info Report Check
Submission incomplete:
Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVM v.1.2 para 206 & 221(d))
Issue:
The monitoring plan requires the measurement of the Cogeneration system electricity output (CEO) while the monitoring report indicates that this parameter is calculated. Further information is required how the DOE verifies the monitoring of CEO as per the monitoring plan.