20:29 26 Dec 24
Info Report Check
Submission incomplete:
Scope: The spreadsheet does not contain all parameters required to be monitored and/or reported at the intervals required by the monitoring plan and the applied methodology?
Issue: The applied methodology version 9 (page 16/19) requires the monitoring of parameter 'TEGy = Total electricity produced by the project activity, including the electricity supplied to the grid and the electricity supplied to internal loads', as well as parameter "PEFC,j,y = CO2 emissions from fossil fuel combustion in process ". However, no monitored data have been submitted. Kindly provide the required monitoring results for this required parameter.
Scope: The spreadsheet does not contain all parameters required to be monitored and/or reported at the intervals required by the monitoring plan and the applied methodology?
Issue: The applied methodology version 9 (page 16/19) requires the monitoring of parameter 'TEGy = Total electricity produced by the project activity, including the electricity supplied to the grid and the electricity supplied to internal loads', as well as parameter "PEFC,j,y = CO2 emissions from fossil fuel combustion in process ". However, no monitored data have been submitted. Kindly provide the required monitoring results for this required parameter.
Offset now: visit the United Nations Carbon Offset Platform