Info Report Check
Submission incomplete:
Scope: The verification and certification report does not list each parameter required by the monitoring plan and does not provide an statement on how the DOE verified the information flow for these parameters including the values in the monitoring reports as per VVS version 09.0 paragraphs 393 and 409 (e).
Issue:The DOE is requested to provide further information on how it verified that the use of the data vintage (06/2005- 11/2014) for the calculation of the Build Margin (BM) is in line with the applied methodology ACM0002 version 4 (p 9) of the PDD, which states that the ex-post calculation of the BM value need to be updated annually for the year in which actual project generation and associated emissions reductions occur.