Info Report Check
Submission incomplete:
1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue: The PP is required to provide calibration records of all the meters covered for the entire monitoring period of 02 Sep 08 - 30 Jun 11.
2: Scope: The verification report does not provide an assessment of the compliance with EB 52 Annex 60 'Guidelines for assessing compliance with the calibration frequency requirements' for the calibration delay. (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue: The DOE is requested to further clarify how it verified the delayed calibration of meters as per the EB 52 Annex 60 as 1) the verification report (p 25) states that “The correction factor, in accordance with Annex 60 EB 52, has been applied for the month of January 2009, for both the sites Baramsar and Soda-Mada” while the spreadsheet submitted indicates that “correction factor” was applied for September 2008 – January 2009 and January - April 2010 and 2) the DOE did not verify the results of the delayed calibrations as per para 4(a) of EB 52 Annex 60.
1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue: The PP is required to provide calibration records of all the meters covered for the entire monitoring period of 02 Sep 08 - 30 Jun 11.
2: Scope: The verification report does not provide an assessment of the compliance with EB 52 Annex 60 'Guidelines for assessing compliance with the calibration frequency requirements' for the calibration delay. (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue: The DOE is requested to further clarify how it verified the delayed calibration of meters as per the EB 52 Annex 60 as 1) the verification report (p 25) states that “The correction factor, in accordance with Annex 60 EB 52, has been applied for the month of January 2009, for both the sites Baramsar and Soda-Mada” while the spreadsheet submitted indicates that “correction factor” was applied for September 2008 – January 2009 and January - April 2010 and 2) the DOE did not verify the results of the delayed calibrations as per para 4(a) of EB 52 Annex 60.