Info Report Check
Submission incomplete:
1: Scope: The monitoring report does not contain the implementation status of the project (including a brief description of the installed technology and/or equipments, relevant dates of project activity e.g. date of construction, commissioning, continued operation periods, etc.) during the monitoring period under consideration. (EB48 - Annex 68 paragraph 10 (a) (i) & EB 54 Annex 34).
Issue: The monitoring report does not describe the employed technology of the main processes implemented in the project activity (such as for the CCR dehydratation and transportation, grinding and storage, raw material homogenization, kiln system and dedust system).
2: Scope: The monitoring report does not contain the values of the monitored parameters. (EB 54 Annex 34)
Issue 1: AM0033 version 2 (page 13) requires to monitor and report possible impurities in the raw mix so as to guarantee that the difference in mass can be be attributed to CO2 emissions only, or corrected otherwise. However, this has not been reported in the Monitoring Report.
Issue 2: The monitoring plan (page 28) and AM0033 version 2 (page 13) require to monitor the quality of clinker monthly. However, the results of the tests have not been reported in the monitoring report.
3: Scope: The spreadsheet does not contain all parameters required to be monitored and/or reported at the intervals required by the monitoring plan and the applied methodology.
Issue 1: The Monitoring Plan (page 28) specifies that LOI* should be calculated based on M1, M2 and Mw of the samples, which should be measured monthly. However, the spreadsheet submitted does not contain the values of the measurements of M1, M2 and Mw.
1: Scope: The monitoring report does not contain the implementation status of the project (including a brief description of the installed technology and/or equipments, relevant dates of project activity e.g. date of construction, commissioning, continued operation periods, etc.) during the monitoring period under consideration. (EB48 - Annex 68 paragraph 10 (a) (i) & EB 54 Annex 34).
Issue: The monitoring report does not describe the employed technology of the main processes implemented in the project activity (such as for the CCR dehydratation and transportation, grinding and storage, raw material homogenization, kiln system and dedust system).
2: Scope: The monitoring report does not contain the values of the monitored parameters. (EB 54 Annex 34)
Issue 1: AM0033 version 2 (page 13) requires to monitor and report possible impurities in the raw mix so as to guarantee that the difference in mass can be be attributed to CO2 emissions only, or corrected otherwise. However, this has not been reported in the Monitoring Report.
Issue 2: The monitoring plan (page 28) and AM0033 version 2 (page 13) require to monitor the quality of clinker monthly. However, the results of the tests have not been reported in the monitoring report.
3: Scope: The spreadsheet does not contain all parameters required to be monitored and/or reported at the intervals required by the monitoring plan and the applied methodology.
Issue 1: The Monitoring Plan (page 28) specifies that LOI* should be calculated based on M1, M2 and Mw of the samples, which should be measured monthly. However, the spreadsheet submitted does not contain the values of the measurements of M1, M2 and Mw.