Info Report Check
Submission incomplete:
As per VVS para 361 (e), the DOE shall determine whether quality assurance and quality control procedures have been applied in accordance with the registered monitoring plan.
As the monitoring plan states that net electricity supplied by the project activity to CCPG will be double checked by receipt of sales, the DOE is requested to clarify how it crossed-checked the values of EGfacility,y with the ETN values as the values provided in the spreadsheet are not independent variables but linked to the data reading records cells. For example, regarding the period 26/01/2013-25/02/2013 the cell for value from ETN (cell E7) is linked with the cell for value from Power Export(Data reading records)/Electricity export (MWh) (cell D7).