02:13 20 Nov 24
Info Report Check
Submission incomplete:
Scope: The verification report does not list each parameter required by the monitoring plan and does not provide an statement on how the DOE verified the information flow (from data generation, aggregation, to recording, calculation and reporting) for these parameters including the values in the monitoring reports (VVS v2, para 236, 284 (e)).
Issue: The DOE is requested to clarify how it has verified the correctness of the operating margin calculation provided in the CER calculation spreadsheet using simple average approach instead of weighted average as required by the applied methodology ACM0002 version 02 (page 05) and the approved revised PDD version 06 (page 16 and 22).
Scope: The verification report does not list each parameter required by the monitoring plan and does not provide an statement on how the DOE verified the information flow (from data generation, aggregation, to recording, calculation and reporting) for these parameters including the values in the monitoring reports (VVS v2, para 236, 284 (e)).
Issue: The DOE is requested to clarify how it has verified the correctness of the operating margin calculation provided in the CER calculation spreadsheet using simple average approach instead of weighted average as required by the applied methodology ACM0002 version 02 (page 05) and the approved revised PDD version 06 (page 16 and 22).
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: