Info Report Check
Submission incomplete:
Scope: The monitoring report does not contain calculations of baseline emissions, project emissions, leakage (if any), and emission reductions, including reference to formulae and methods used as per PS version 09.0 paragraph 253.
Issue: There is an inconsistency of the CER between the monitoring report/verification/certification report/MR12 summarized - LLC - V.3 spreadsheet (460,312 CO2) and the project view page/signed form (470,616 CO2).