08:55 12 Jul 25
Info Report Check
Submission incomplete:
1: There is no monitoring diagram showing monitoring points in section C of the Monitoring Report. As per the Instructions for completing form CDM-MR-FORM, line diagrams showing all relevant monitoring points shall be included in section C.
2: There is no information how the DOE verified that the commissioning date of the project activity is 10/06/2014 and the electricity generation commenced on 06/10/2015. Please refer to paragraph 354 of VVS for project activities (version 02.0).
3: Parameter EGi,j,y as per the meth/PDD is "Quantity of electricity supplied to the recipient j by the generator, which in the absence of the project activity would have sourced from ith source during the year y". As per the MR, this parameter is measured by meter installed after the generator. The DOE is requested to explain how monitoring point of this parameter represents the quantity of electricity supplied to recipient j which would have sourced the electricity from ith source (i.e. not to other recipients that would have sourced the electricity from different source). Please refer to paragraph 361(b) of VVS for project activities (version 02.0).
4: In regard to the project emissions from electricity consumption, the PDD describes that the project falls to case C.III. As per page 12 of “Tool to calculate baseline, project and/or leakage emissions from electricity consumption”, version 01, default value of 3% can be used for project electricity consumption if the electricity consumption by all project and leakage electricity consumption sources is smaller than the electricity consumption of all baseline electricity consumption sources. There is no information how this condition has been met by the project activity in order to apply default value of 3% for project emissions. Please refer to paragraph 373(e) of VVS for project activities (version 02.0).
1: There is no monitoring diagram showing monitoring points in section C of the Monitoring Report. As per the Instructions for completing form CDM-MR-FORM, line diagrams showing all relevant monitoring points shall be included in section C.
2: There is no information how the DOE verified that the commissioning date of the project activity is 10/06/2014 and the electricity generation commenced on 06/10/2015. Please refer to paragraph 354 of VVS for project activities (version 02.0).
3: Parameter EGi,j,y as per the meth/PDD is "Quantity of electricity supplied to the recipient j by the generator, which in the absence of the project activity would have sourced from ith source during the year y". As per the MR, this parameter is measured by meter installed after the generator. The DOE is requested to explain how monitoring point of this parameter represents the quantity of electricity supplied to recipient j which would have sourced the electricity from ith source (i.e. not to other recipients that would have sourced the electricity from different source). Please refer to paragraph 361(b) of VVS for project activities (version 02.0).
4: In regard to the project emissions from electricity consumption, the PDD describes that the project falls to case C.III. As per page 12 of “Tool to calculate baseline, project and/or leakage emissions from electricity consumption”, version 01, default value of 3% can be used for project electricity consumption if the electricity consumption by all project and leakage electricity consumption sources is smaller than the electricity consumption of all baseline electricity consumption sources. There is no information how this condition has been met by the project activity in order to apply default value of 3% for project emissions. Please refer to paragraph 373(e) of VVS for project activities (version 02.0).