Scope: The verification report does not provide an assessment that all physical features of the proposed CDM project activity proposed in the registered PDD are in place and/or that the project participant has implemented and operated the proposed CDM project activity as per the registered PDD or the approved revised PDD. (VVM v.1.2 para 196)
Issue:The verification report page 8 has mentioned that the inconsistencies of the type of turbine and generator have been accepted by the EB in the first monitoring period. The actual types have no essential difference and inconsistencies with the types stated in the PDD. However, DOE is requested why correction was not made in accordance with the CDM Project Cycle Procedure version 2 paragraph 130(b)(i)
Scope: The verification report does not provide an assessment that all physical features of the proposed CDM project activity proposed in the registered PDD are in place and/or that the project participant has implemented and operated the proposed CDM project activity as per the registered PDD or the approved revised PDD. (VVM v.1.2 para 196)
Issue:The verification report page 8 has mentioned that the inconsistencies of the type of turbine and generator have been accepted by the EB in the first monitoring period. The actual types have no essential difference and inconsistencies with the types stated in the PDD. However, DOE is requested why correction was not made in accordance with the CDM Project Cycle Procedure version 2 paragraph 130(b)(i)
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: